Sunday, June 23, 2013

Hallway update

After MANY long hours of ripping up two layers of floor and hundreds of nails, the downstairs hallway is ready for hardwood floors!

Remember these pictures? This is the floor before, facing the front door

This is the floor before, facing the back door
 
Safety first!

The floor came off one tile at a time

Proof that I helped with the demo too!

Hallway after, facing the front door

Closet

Just inside the back door, ready for hardwood on top. All we have left to rip up is the utility room, which will be our new downstairs bathroom. We are almost done with the demo, and ready to start putting things back together!

 
 

No comments:

Post a Comment